PROJECTS UNDERTAKEN BY THE LEDZOKUKU MUNICIPAL ASSEMBLY

LEDZOKUKU MUNICIPAL ASSEMBLY PROGRAMME/PROJECT/INITIATIVE

List of project undertaken by the Municipal Assembly, Teshie.


1. Re-Roofing of visual Art, Home Economics &Business Block at Teshie Presby Secondary School.

2. Construction of Fence wall around Lekma Head Office.

3. Maintenance of 510 No. Street light for Lekma.

4. Fabrication and supply of 450 Mono Desks and 350 Dual Desk for schools within lekma.

5. Rehabilitation of Teshie Lekma '12' JHS   school block.

6. Construction of ground floor of 3 storey 18 unit classroom block with ancillary facilities.Krobo 1&2 school*
( *Phase 1, 6unit classroom block with ancillary facilities )

7. Gravelling of Penny Culvert Approaches ph I

8. Drainage works at 9th Fertilizer Link ph. V

9. Construction of 1.2m Double pipe Culvert at Penny.

10. Construction of 0.6m Drain along Dar-Er-Salam Street.

11. Drainage works at East Okpoigonno

12. Drainage works along UBA road, Teshie.

13. Road Repair Works at Oak street,
Bannerman clinic

14. Construction of 2.0 By 1.5m storm Drain at Tebibanor, Teshie.

15. Construction Double Box Culvert on Park Avenue.
( GhanaTelecom,Teshie)

16. Construction of double box Culvert on Cocoa street, A-life Area (11% completed)

17. Culvert repair at Alloway.

18. Construction of 1.2m Double pipe Culvert at Penny.

19.Pothole patching, resealing and grading of selected roads in Teshie.      ( 10% completed)

20. Rehabilitation of Volta Street, Near Ford  School Junction.

The Government is doing extremely well through our Municipal Assembly, Teshie.

More projects/ initiatives are in the pipeline and will soon be publish for the good people of Teshie to know.

Together we can !!
 Ghana is working Again, Teshie is working again

Comments

Popular posts from this blog

LeKMA HANDS CHAIRS AND TABLES OVER TO THE MUNICIPAL DIRECTORATE,TESHIE.

MCE, LeKMA DONATES TO TESHIE DISTRICT POLICE HEADQUATERS

LeKMA, MCE ATTENDS SOD CUTTING CEREMONY FOR REMOULDING OF THE GHANA MILITARY ACADEMY